N4 Dromod to Rooskey Bypass

Project Details

  • Client: Jons Civil Engineering
  • Location: Leitrim, Ireland
  • Value: €31 Million
  • Length: 11 Km

Project Description

CH2M Barry was employed as designer for Jons Civil Engineering through the Tender process and subsequent design and Construction Stages of this Design & Build Contract.

The N4 links Dublin to Sligo. This section from south Rooskey to North of Dromod is 11Km Long. Originally to be a 2+1 road type the design was upgraded to a 2+2 road type during the detailed design stage.